User login

Weekly Report - 26 January 2018

30

Jan

2018

This week was very short due to NZNOG. I worked on cleaning and processing the recovery times I re-collected after the modifications to the timing method of the simulation framework. I have graphed and computed stats based on the collected raw data. I then quickly fixed up comments in my simulation framework and have started looking at my multilink failure scenario. This failure scenario is currently disabled as the reactive and proactive controllers weren't timing the same thing. I am currently in the process of devising a better way to handle multi-link failure scenarios and modifying it so that the recovery times are comparable between the two different controller types.